CHALLENGE:

A Fortune 100 Consulting Group was looking to build a greenfield net-zero facility with a large industrial load and to evaluate multiple potential locations.

Given the large facility load, the client needed a mixture of on-site generation and an IPP/PPA.

SOLUTION:

Xendee simultaneously modeled both in front of the meter and behind the meter assets as separate technologies within the same model. Additional variable costs for IPP service margin, as well as necessary infrastructure upgrade capital costs were all factored into the modeling.

RESULTS:

For each potential site location considered, Xendee generated an optimal technology mix (behind the meter and in-front of the meter) that met net-zero and load requirements while minimizing costs.

The analysis provided a robust view of the shared and individual benefits accrued to the client and the IPP.

Mid-Sized Global Consultancy: Steel Mill

Mid-Sized Global Consultancy: Steel Mill

CHALLENGE: A mid-sized global consulting company was engaged by a steel mill to evaluate a few unsolicited solar proposals they had received for a...

Read More
Mid-Sized Global Consultancy

Mid-Sized Global Consultancy

CHALLENGE: The Consulting company had been asked to determine the optimal use of land at a series of retired or soon-to-be-retired coal mines and...

Read More
Santa Rosa Junior College Microgrid

Santa Rosa Junior College Microgrid

Santa Rosa Junior College (SRJC) is currently developing a renewable energy generation based Microgrid concept and design to address power...

Read More