Large electric utility infrastructure company was developing an energy solution for a large, new, greenfield mixed commercial/residential facility in southern California where the local utility could only support up to 3MW of imports, requiring the energy load to be delivered onsite.


 

Challenge:

Large electric utility infrastructure company was developing an energy solution for a large, new, greenfield mixed commercial/residential facility in southern California.

The local Utility can only support up to 3MW of imports, so the majority of the expected load would have to be delivered onsite.

The client was interested in carport solar and linear generators, and wanted to know the optimal mix and expected usage of the microgrid for an Energy as a Service (EaaS) request for proposal response. 

Solution:

Using Xendee, the client was able to build a realistic load profile for the building type and expected peak load.

They modeled the specific generator performance they were considering, and pulled local solar performance data.

Then limited the correct local tariff and interconnection constraint from the Utility

Results:

Running a minimum cost optimization in Xendee resulted in the expected annual dispatch, total and average costs of energy, and the optimal mix of solar and generators to support the site.

With this, the client was able to provide a quote for the lowest cost solution that would still reliably serve the expected load.

Rocky Mountain Institute

Rocky Mountain Institute

A non-profit consulting for a municipality needed to model a mixed-use residential and commercial building with a large electrical load that could be...

Read More
Global Renewable Energy Consultant & EPC

Global Renewable Energy Consultant & EPC

A global renewable energy consultancy and EPC was looking to develop a DER solution to support electric truck charging at a greenfield truck stop...

Read More
Endurant Energy Case Study - Behavioral Health Facilities

Endurant Energy Case Study - Behavioral Health Facilities

Endurant Energy used Xendee’s platform to assess technical and financial options for new distributed energy resources (DER) at three California...

Read More